The challenge
A Tier 1 customer, a provider of plastic subassemblies for instrument panels, urgently needed 24 packaging prototypes within a two-week timeframe. The timely delivery of all packaging was critical to support an upcoming OEM audit at their facilities.
The solution
Utilizing Nestimator, our unique IT tool capable of rapidly generating 3D visualizations for each solution, we efficiently produced the designs within a matter of days. Our engineering department, coupled with our dedicated prototype shop, worked seamlessly to deliver the prototypes within the specified timeframe.
The result
Our solution submitted a highly dense packaging design of the utmost quality. Following the OEM audit, our solution not only proved to be the fastest but also stood out as the 'best in class.'